When using dry developer, the drying operation is performed

Prepare for your Liquid Penetrant Inspection (LPI) Level 1 Test. Study with multiple choice questions and detailed explanations. Boost your confidence and knowledge to excel in the examination.

Multiple Choice

When using dry developer, the drying operation is performed

Explanation:
In dry developer use, the surface must be completely dry before applying the developer. After you remove excess penetrant, you dry the surface thoroughly so the dry powder can adhere evenly. Moisture or any residual solvent will cause the powder to clump or smear, hiding or distorting indications. Once the surface is dry, you apply the dry developer and then perform the inspection. So the drying step happens right after removing excess penetrant and before the inspection.

In dry developer use, the surface must be completely dry before applying the developer. After you remove excess penetrant, you dry the surface thoroughly so the dry powder can adhere evenly. Moisture or any residual solvent will cause the powder to clump or smear, hiding or distorting indications. Once the surface is dry, you apply the dry developer and then perform the inspection. So the drying step happens right after removing excess penetrant and before the inspection.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy